1. Material selection: are you over-specifying?
The fastest cost reduction is the one done on the drawing before any steel is cut. The question is simple: does this part need the alloy, grade or temper you specified, or did the spec creep upward from a safer-sounding number? A part called out in a premium grade when a standard one would do pays the premium on every unit forever.
On die cast work the same logic applies to alloy choice. ADC12 and A380 cover a very large share of structural and housing parts; reaching for a specialty grade should be justified by a property the standard grade cannot meet. Our tooling cost guide explains how material and tooling decisions compound across a run.
2. Design for manufacturability: simplifying production
Every feature that needs a special tool, a secondary operation or a hand-finishing step adds cost and a failure point. Features that run straight out of the die or the first machining setup are nearly free by comparison. Designing for the process you will actually use, rather than for the CAD model alone, is the core of value engineering.
3. Tolerances: the fear tax
Tight tolerances are often specified out of caution rather than need. Each step tighter than the process naturally holds adds inspection, scrap and rework. The discipline is to relax every dimension that does not functionally require it and to spend the tight tolerance where it actually earns money. This is the single most common over-spend we see on incoming drawings.
4. Finishes and cosmetics: choosing the right process
A cosmetic surface that nobody sees in use is a tax paid on every part. Match the finish to where the eye or the environment actually is. A face that sits inside an enclosure does not need the same treatment as one on the product exterior, and specifying the expensive option everywhere is quiet money left on the table.

5. Assembly: the power of integration
Every separate component is a purchase order, a handling step and a place to go wrong. Combining two parts into one casting or one machined blank removes those costs and the tolerance stack between them. The trade-off is tooling complexity, which is why this lever pairs with the tooling discussion rather than replacing it.
6. Five proven VAVE levers
Trim the fat: weight reduction
Less material is less cost, full stop, and on shipping-weight-sensitive parts it keeps paying after the sale. Wall sections sized to the load rather than to a round number are the easiest win.
Stop paying the fear tax: tolerance relaxation
Walk every dimension and ask what function the tight number serves. Where none exists, loosen it and move the saving to the dimensions that matter.
Combine and conquer: part consolidation
Folding two or three stamped or machined pieces into a single die cast component removes assembly, fasteners and alignment error in one move.
Surface finish: do you need that polish?
Specify the finish to the environment, not to habit. Internal and hidden faces rarely earn a premium treatment.
Leverage standard components
Where a catalog part does the job, use it. Designing a custom version of something standard trades a small unit saving for a permanent tooling and inventory cost.
The 2026 angle: commodity exposure
One cost lever buyers now design around is metal price risk. Aluminium and zinc track commodity indices, and alloy surcharge can move the unit cost between quote and production. Designing to need less material, or choosing an alloy less exposed to those swings, is a value-engineering decision that protects the budget after the contract is signed. Our machining cost guide and hybrid manufacturing note cover how material and process choices interact on cost.
Summary checklist: ten design-for-cost questions
Is the alloy over-specified for the function the part performs?
Can any feature be simplified out of a secondary operation?
Which tolerances can be relaxed without losing function?
Where is the finish actually seen or exposed to environment?
Can two parts become one through consolidation?
Is a standard component doing the job of a custom one?
Is the wall section sized to load rather than habit?
Does the assembly step add value or just cost?
How much material is the design exposed to commodity swings?
Has the drawing been checked by someone who builds it, not just draws it?
Send us the drawing before it is frozen
Value engineering pays most when it happens early. Share the part and we will flag the dimensions, features and material calls where cost hides, before tooling commits you to them.