PPAP is how an automotive customer proves, before the first production shipment, that your die casting supplier can make the part to print repeatably. It is a document package, not a test. The supplier assembles evidence that the design, the process and the measurements all agree, and the customer signs the Part Submission Warrant to say so.
If your program carries a PPAP requirement, the level and the customer-specific requirements should be settled at the quote stage, not after the tool is cut. A silent RFQ prices the wrong evidence package, and both sides discover it at the worst moment.
1. What PPAP is, and what it is not
PPAP stands for Production Part Approval Process. It sits at the end of the APQP product development cycle and is defined by the AIAG PPAP manual, currently the fourth edition. The core idea is simple. Before production parts ship, the supplier shows documented evidence that the process that made the samples is the process that will make production.
Three things PPAP is not:
Not a one-time test. A good first article does not prove capability. PPAP looks at the process behind the parts, including how it will be controlled over time.
Not the same as certification. IATF 16949 certification says a quality system exists. PPAP says this part, from this tool, in this process, meets this drawing. One does not replace the other.
Not negotiable after the fact. If PPAP level and scope are not in the RFQ, the supplier prices the wrong evidence package and you both discover it at the worst moment.
2. The five submission levels
All 18 elements must exist and be retained on file regardless of level. The level only controls what physically travels to the customer. That distinction causes more confusion than anything else in the process.
Level 1. The Part Submission Warrant goes to the customer, plus an Appearance Approval Report if the part is cosmetic. Everything else stays on file at the supplier. Common for low-risk parts and minor changes.
Level 2. The warrant, sample parts, and a limited set of supporting data the customer specifies.
Level 3. The warrant, samples, and complete supporting data. This is the default when the customer has not stated a level, and the one most first-time submissions land on.
Level 4. The warrant plus whatever else the customer defines, which can be more or less than Level 3.
Level 5. Everything in Level 3, reviewed on site at the supplier. Typical for safety-critical parts or new suppliers.
Ask for the level in writing in your RFQ. If the RFQ is silent, plan on Level 3.
3. The 18 elements, in five families
Memorizing 18 numbered elements is not useful. Grouping them is. Every element answers one of five questions.
What is the part
Design records. The released drawing and CAD data at the correct revision.
Engineering change documents. Any authorized changes not yet folded into the drawing.
Customer engineering approval. Required when the customer owns the design.
What could go wrong
Design FMEA. Design risks and controls, from the design-responsible party.
Process flow diagram. Every operation from incoming material to shipment, including rework and inspection.
Process FMEA. Failure modes in production, with detection and prevention controls.
Control plan. What is checked, how, how often, and what happens when it drifts.
Can we trust the numbers
Measurement system analysis. Gauge R&R studies proving the gauges are capable. A common industry expectation is percent GR&R at or below 10 percent, with 30 percent as the outer limit of acceptance.
Dimensional results. Every ballooned characteristic measured and recorded, with actual values.
Qualified laboratory documentation. Accreditation scope for the labs that ran the tests.
What the part actually is
Material and performance test results. Composition against the ordered grade, mechanical properties, and functional tests such as leak or pressure tests where the application needs them.
Initial process studies. Capability on the significant characteristics, with Ppk or Cpk at 1.67 as the common initial-study expectation on a stable, normal process.
Sample production parts. Parts from the qualified run, quantity per the customer.
Master sample. A retained, signed reference part.
Appearance approval report. Color, texture and finish sign-off for cosmetic parts.
The declaration
Checking aids. Fixtures and gauges built for the part, with calibration records.
Customer-specific requirements. Anything the customer mandates beyond the AIAG default.
Part Submission Warrant. The one-page signed declaration that ties the package together and states that the parts conform.
4. What a die casting supplier can realistically produce
A factory running ISO 9001 with IATF 16949 for automotive programs already generates most of this evidence as a matter of course. What you should expect to receive, and what to ask about:
First article inspection reports. Full dimensional results against a ballooned drawing. Ask to see one from a similar part before you place the order.
Capability studies. Ppk or Cpk on the characteristics you designate as critical, from a run that represents production, not a hand-picked sample.
Control plan and process flow. These should be quotable deliverables, not something assembled after the fact.
Material certificates. Composition against the ordered alloy, traceable to the melt or heat lot. For castings this is the element that most often ties back to the UFLPA traceability question in our import compliance guide.
Gauge studies. R&R on the gauges that will actually be used on the line.
What no factory can do is guarantee a PPAP outcome. Capability depends on the process, the tool and the volume, and a supplier who promises approval before running the parts is guessing.
5. The five reasons packages get rejected
Across supplier quality reviews, the rejections cluster tightly:
Revision mismatch. The drawing, warrant, control plan and dimensional report disagree on revision level. This alone kills packages before anyone opens the data.
Dimensional results without substance. Missing balloons, or “OK” written where a measured value belongs.
Capability studies on the wrong parts. Too few pieces, or pieces that did not come from a significant production run.
Measurement studies skipped. The gauges on the line were never studied, so every dimensional number carries unknown error.
Customer-specific requirements ignored. Element 17 is skipped more than any other, and it is frequently mandatory.
Every one of these is a paperwork discipline problem, which is good news. They are cheap to prevent and expensive to discover.
6. A buyer checklist for the RFQ stage
State the submission level in the RFQ, and name the customer if it is a Tier-1 program.
Attach the current drawing revision and CAD, and say which revision governs.
List your critical characteristics and the capability target you expect on each.
Name the tests that matter for your application, leak, pressure, hardness, salt spray.
Ask whether the supplier is IATF 16949 certified and whether the scope covers your part family.
Ask for a sample first article report and control plan from a comparable job.
Confirm what the evidence package costs and when it is delivered, since it is part of the program budget, not a free add-on.
For the supplier-side checks that come before any of this, our pre-RFQ supplier verification guide covers the rest of the audit trail.
The paperwork is the partnership
A supplier who can produce this package on demand is telling you something about how the parts are made. A supplier who treats it as an obstacle usually has the same attitude toward the process behind it. Write the level and the scope into the RFQ, and the first production run stops being a gamble.
Planning a program that carries PPAP or customer quality requirements?
Send your drawings and the customer requirements, and we will map the evidence package before quoting. Our die casting services run under ISO 9001, so the documentation your customer asks for comes from the same floor as the parts.
Related guides in this topic
Authoritative references
- IATF 16949 - Automotive quality management scheme (IATF)
- ISO 9001 - Quality management systems (ISO)
- NADCA die casting standards & product specifications
Independent third-party standards and industry bodies, provided for further reading. Sureton is not responsible for third-party content.